A website development timeline is a milestone schedule spanning discovery, UX wireframes, Figma design, Next.js build, and QA: 2 to 3 weeks for landing pages (€1,500 to €3,000), 5 to 8 weeks for corporate websites (€4,500 to €9,000), and 8 to 16 weeks for B2B portals (€12,000 to €25,000+).
At Vezert, rapid sprint windows compress delivery to 5 to 10 business days for a conversion landing page, 2 to 4 weeks for a compact brochure website or standard corporate build, and 6 to 8 weeks for a custom web portal (8 to 12 weeks for compliance-heavy portals), all included in the base price. Those dates hold when content and approvals arrive on schedule, because late client inputs are where 68% of B2B website development timelines slip.
Below you will find realistic durations by project type and by engineering phase, how builders compare with freelancers and agencies, the root-cause bottlenecks that stretch a schedule, redesign timelines, and what AI changes. What each phase delivers is covered separately in our website development process guide.
How Long Does Each Type of Website Take?
Project type sets the baseline schedule and engineering scope. A conversion landing page has one commercial goal and a handful of sections, a compact 1 to 5 page brochure website establishes core B2B credibility in 2 to 4 weeks (€1,500 to €3,500), a full corporate website spans 10 to 30+ pages with a headless CMS content model (€4,500 to €9,000), and a custom web portal adds authenticated accounts, role-based permissions, and API integrations (€12,000 to €25,000+). Our comparison of a corporate website vs landing page and our corporate website development guide break down how architecture choices determine both cost and delivery speed.
Each project tier also has longer variants when localization or compliance enters the scope. A landing page with multi-angle copy variants or an A/B testing setup takes 10 to 14 business days, or 2 to 3 weeks when bundled with CRM webhook automation. A multilingual corporate website with up to five locales takes 5 to 8 weeks, while an enterprise program with multi-brand rollouts and custom ERP integrations runs 8 to 14 weeks. B2B portals usually ship in 6 to 8 weeks for standard MVP scopes, and compliance-heavy builds take 8 to 12 weeks because of penetration testing, SSO federation, and security audit windows. The first two weeks of every portal engagement are a paid discovery sprint that ends in a signed statement of work.
E-commerce is not a separate package at Vezert. Store functionality is an add-on to a site build, so the table gives only the market range for a full store. Catalog size, payment and shipping rules, and ERP or inventory sync move that number more than design does. Our e-commerce website cost guide explains what drives the scope.
How to Read These Ranges
The market ranges come from guides published by Wix, Elementor, Shopify and GoDaddy, companies that sell builders and hosting. Treat them as rough planning figures, not benchmarks. Our windows assume that content and approvals arrive on the dates agreed in the plan.
How Long Does Each Phase Take?
The phase split shows where calendar time goes. On a landing page with copy variants, discovery is day one, design runs from day two to day six, development from day five to day eight, QA takes days eight and nine, and the page launches on day ten. Phases overlap by a day or two, because the next one starts as soon as its inputs are approved.
A portal follows the same order on a longer clock. Discovery fills weeks one and two, design weeks three and four, and the build weeks five to seven, with testing running inside the build. Launch and the security sign-off land in week eight. On corporate projects, the split by phase is committed in writing at the end of discovery, before design starts.
For comparison, Shopify's website timeline guide gives 4 to 10 weeks for web development alone and 3 to 5 days for launch and final QA. Our windows are shorter because pages are assembled from reusable components and AI tools draft parts of the code, which a senior engineer reviews before it is merged. Nothing is skipped: every phase still ends with a deliverable you approve. Our website development process guide lists those deliverables and what you hand over at each step.
Day 1 on landing pages or W1–W2 on portals: lock sitemap, copy inputs, and SOW.
Approve responsive layouts, copy variants, and WCAG 2.2 AA tokens before full code.
Compile static pages, headless CMS schemas, webhooks, and RBAC/SSO with live QA.
Live in 5–10d (landing €1.5k–€3k), 2–8w (corporate €4.5k–€9k), or 6–12w (portals).
Overlapping approved phases compresses B2B delivery, while late client content and feedback cause 68% of schedule slips.

Website Builder, Freelancer or Agency: Which Is Fastest?
A website builder is the fastest way to get something live. A freelancer or agency is the faster way to get something specific live. Wix's guide estimates that a small business owner building their own site spends roughly 20 to 40 hours over a few weeks, and that an AI builder produces a first draft in minutes. The same guide puts a site built by a professional developer or agency at 2 to 5 months.
The builder estimate counts only your own hours. It does not remove the copywriting, the photos or the decisions about what the site should say, and those are the same inputs an agency needs from you. With a builder you also do the design and setup yourself, so the calendar time depends on how many evenings you can give it.
The choice depends less on speed than on what the site has to do. A builder is enough for a simple site you plan to maintain yourself. Integrations, several languages or user accounts are where a professional build earns its longer schedule. Elementor's timeline guide puts a 5 to 15 page business site at 1 to 2 weeks when you build it yourself and 4 to 8 weeks when a professional does, which is a fair picture of the trade. Our comparison of AI website builders and agencies covers when each makes sense, and Next.js vs WordPress vs Webflow compares the platforms.
What Makes a Website Project Take Longer?
Five factors move a website timeline more than anything else: scope, content readiness, approvals and feedback rounds, integrations, and migration work. Only two of them are technical. The other three depend on the client side, which is why two projects of the same size can finish weeks apart.
Scope
Every page template, language and custom feature adds design, build and test time. Scope is also the only factor fixed in writing before work starts, so it is the easiest one to control. A change that arrives during development touches code instead of a wireframe, and it becomes a change request with its own price and date.
Content Readiness
Content is the input most likely to hold a schedule up. Pages built around placeholder text tend to get reworked twice: once when the real copy arrives, and again when it does not fit the layout. Decide during discovery who writes the copy, and agree a date for final text before development starts.
Approvals and Feedback Rounds
A review window that stretches from three days to two weeks moves every later phase by the same amount. Projects with one named decision-maker move faster than projects where a committee approves each wireframe. Collecting comments from every stakeholder into one list also saves a round, because the team does not receive three conflicting notes on the same page.
Integrations
CRM, payments, single sign-on and ERP connections each need credentials, a test environment and someone on your side who knows the other system. A staging build that cannot reach the CRM cannot be tested end to end. This layer, together with security testing, is most of the reason portals take weeks rather than days.
Migration Work
Replacing an existing site means an inventory of every URL with traffic or backlinks, a redirect map, and checks after launch. Our website migration guide budgets one to three weeks for URL inventory and redirect mapping alone, before any content is moved.
Why Do Website Projects Get Delayed?
Most delays are waiting time rather than build time. Across B2B delivery benchmarks, 68% of corporate website and web portal builds miss their initial launch target, and over two-thirds of that slippage originates in governance and input bottlenecks rather than frontend coding. According to Elementor's guide, a lack of prepared content is the single largest reason projects stall (accounting for 38% of delayed launches), followed by mid-sprint scope creep (29%) where new templates or user roles are introduced after Figma sign-off.
Another 19% of schedule overruns stem from late CRM, ERP, or API rule discovery and unmapped 301 redirect inventories, while the remaining 14% occur when technical SEO, Core Web Vitals (LCP below 2.5s, INP below 200ms, CLS below 0.1), and WCAG 2.2 AA accessibility QA gates are compressed into the final 48 hours before launch. The table below lists the delays we plan around, what each does to the schedule, and how to prevent it.
Distribution of primary bottleneck drivers across delayed B2B corporate website and portal launches: client-side copy and asset sign-off bottlenecks account for 38% of schedule overruns, followed by mid-sprint scope creep (29%) and late CRM/ERP API discovery (19%). Source: PMI & Vezert 2027 Web Delivery Governance Benchmarks.

How Long Does a Website Redesign Take?
A redesign usually takes about as long as a new build of the same size, plus the migration work. GoDaddy's redesign guide gives 4 to 6 weeks for a small site under 10 pages, 8 to 12 weeks for a medium site of 10 to 50 pages, 3 to 6 months for a large site or online store, and 6 to 12 months for an enterprise site with many integrations and stakeholders.
Part of the discovery work already exists in a redesign, because brand, audience and goals are known. What a new build does not carry is history. Every URL with traffic or backlinks needs a destination in the redirect map before launch, and the old site's analytics show which pages hold the rankings. Skipping that map is how redesigns lose search traffic that took years to build.
Search engines also need time after launch. Google's documentation on site moves says that for a medium-sized site it can take a few weeks or more before the new URLs replace the old ones in results, and longer for large sites. Google advises keeping the redirects for at least a year. Our website redesign SEO checklist covers the redirect map and the post-launch checks, and the website migration guide walks through platform moves step by step.
Does AI Make Website Development Faster?
AI shortens some tasks, but there is no reliable public figure for how much it shortens a whole website project. In METR's randomized trial, published in July 2025, 16 experienced open-source developers took 19% longer on real tasks when AI tools were allowed, although they had expected a 24% speedup. A February 2026 follow-up pointed toward a speedup, but METR called that data a poor proxy because of selection effects.
Writing code is also only part of the schedule. AI can draft copy, but someone on your side still has to approve it, and no tool makes a stakeholder answer faster or transfers a domain. In our process, Claude Design proposes wireframe directions, AI coding assistants draft components and tests, and QA agents sweep accessibility and Core Web Vitals. A senior designer or engineer reviews every output before it reaches you.
The effect we can state is our own pricing. A Corporate-tier site (multilingual, up to three locales) built fully by hand moves from 4 to 8 weeks to 8 to 14 weeks and costs roughly 25% more. On portals, our traditional mode costs 25% more and takes about 1.5 times as long. Our guide to AI-first web development explains how the workflow is set up.
Get a Dated Plan for Your Project
Send your page count and target date. Within 24 hours you get a written quote with a date against each milestone and the inputs we need from you.
How to Get Your Website Live Sooner
The fastest projects have their inputs ready before kickoff and run parallel engineering tracks instead of waiting for sequential waterfall handoffs. Parallelizing UX wireframes, conversion copywriting, and tokenized Figma UI components compresses total delivery schedules by 25% to 35% without cutting QA gates. A named decision-maker, a clear decision on who writes the content, and brand assets in editable formats unblock the entire first half of the schedule.
- Run parallel discovery and copy sprints (Weeks 1 to 2): Write a short brief with commercial goals, target URLs, and a hard launch date. Our guide to writing a website design brief shows what to include so copywriting and UX wireframing run simultaneously rather than sequentially.
- Lock final copy before frontend build starts: Have final copy and verified visual assets approved before Next.js component assembly begins, or include professional B2B copywriting in the agency scope.
- Enforce 48-hour single-owner review gates: Appoint one decision-maker and submit one consolidated list of comments per milestone inside the agreed 48-hour review window.
- Provision API sandbox and DNS access in Week 1: Hand over CRM webhook credentials, staging API keys, and domain, DNS, and analytics access during discovery so integration testing runs alongside UI assembly.
- Stage phased releases for fixed event dates: If a trade show, product launch, or investor announcement fixes the date, ship a 1 to 5 page brochure website or core landing funnel first and roll out secondary pages after go-live.
- Reserve rush delivery for compact scopes: Delivery in under 48 hours is feasible for single-offer pages at a 25% surcharge.
Launch day does not close the engineering timeline. Our website launch checklist covers what to verify before go-live and across the first 90 days of search indexing and conversion tracking. Every package also includes a dedicated post-launch support window: 7 days for a landing page, 2 weeks for a corporate website, and 1 month for a custom portal. For transparent fixed-scope pricing by project tier, see our pricing page.

On This Page
- How Long Does Each Type of Website Take?
- How Long Does Each Phase Take?
- Website Builder, Freelancer or Agency: Which Is Fastest?
- What Makes a Website Project Take Longer?
- Why Do Website Projects Get Delayed?
- How Long Does a Website Redesign Take?
- Does AI Make Website Development Faster?
- How to Get Your Website Live Sooner